Walls are up and most of the roof trusses are in place. There is a great deal more framing involved on the roof system because of the 4' overhangs around the house and garage.

This house has 130 windows and doors!

40 year asphalt shingles are being installed, about half of the 130 windows and doors are installed. That's right, there are 130 windows and doors in this home.

The roof is complete and work is being done inside on various things like installation of fireplaces, indirect lighting soffets, rough plumbing, infloor hot water heat and much more.

The rough in stage is complete. Wiring is done, security, sound wiring, etc... are all complete. Blown in insulation is installed, the Kalboard is almost complete and Soon the plastering will be underway. The bricklayers have been busy outside.

The insulating bubble wrap is being installed under the garage floor. Next the rebar and pex tubing for the hot water heat will be added.

The concrete floor will be poured to the top of the trench drain. The floor will slope towards the drain from both directions. This continuous drain is 4' in from the overhead doors.

The owners chose a hexagon shaped deck next to the sun room.
20 total images Click for more 1 | 2 | Next >>
 
View Our Detailed Showcase
New Custom Homes, Home Additions, Home Remodels, Decks, and Egress Windows

Featured Services

New Homes, Home Additions, Home Remodeling, Decks, Interior Finishing, Bathrooms, Crown Molding, Fireplaces, Home Bars, and Walk In Closets

Give Dave a call if you're building a New Home, Addition, or Remodeling your home in the following areas:
Waverly Iowa, Cedar Falls IA, Shell Rock Iowa, Denver IA, Janesville IA, Waterloo Iowa, Raymond IA, New Hartford IA, Elk Run Heights Iowa, Evansdale IA, Gilbertville Iowa, Jesup Iowa, Hudson IA.
      

      
Site by Nick Bartlett