|
Over 11000 square feet finished |
Framing has begun on the main level walls |
Main level walls are up |
Second level walls are being framed |
|
Steel columns are needed for tall walls |
Back side |
Circle head windows are being framed in the tall walls |
Single story area has steel columns & beams to support a concrete terrace above. |
|
Tall walls with circle windows are in place on the front side |
Front view, Walls are framed and Tyvek house wrap is on. |
Side view |
Rear View |